Volume of expected rainfall.
Roof drainage design guide.
Secondary or emergency roof drainage is required wherever the buildup of water is detrimental to the roof structure.
Determine 100 year 1 hour rainfall rate used for location of building.
The rain storm the flow of rainwater on the roof surface the ability of the roof drain to move the water from the roof to the piping the vertical piping the horizontal piping and the connection to the point of discharge.
2 3 4 5 6.
Location of drains 5.
Calculate the total roof area by multiplying its length by width.
The greater the slope the less water build up and thus roof load.
The sizing of the roof drainage system must consider all components.
Inspect the current roof drain s and the drain line through the building for leaks and assure that the materials are.
Roofs inevitably serve as temporary rainwater reservoirs.
Rainfall intensity roof catchment area gutter size capacity gutter fall gutter outlets sumps rain heads nozzles downpipe size quantity and placement overflow consideration material.
Determine leader or pipe size.
Pleasing dome shape with a low profile and adequate free drainage area corrosion resisting dome material effective debris protection overflow drainage to allow drainage during debris build up gravel stop positive flashing clamp seepage control channels.
To select the proper roof drain the following information must be known.
Desired rate of drainage 6.
When selecting a roof drain note.
Developing the design criteria for a roof drainage plan that will perform with the roofing system to drain the roof is critical priorto the bid process and roof system installation.
Inspect the roof surface and roof drains on a regular schedule to find and clear away any debris clogging the drains.
Size vertical storm drainage piping.
Structural design of the roof and roof load.
Step by step instructions step 1.
Properly designed roof drain must have the following features.
Select number of roof drains and calculate the roof area sloped to each drain.
2 3 4 5 6 and 8 in.
First and foremost be sure to comply with all local plumbing codes.
Safety load requirement 8.
Type of roof construction 2.
Maximum pipe flow.
In the design and detailing of a roof drainage system consideration must be given to a range of factors such as.
The location and degree to which.
Size horizontal storm drainage piping.
Slope of the roof.
Roof load requirement 7.
Ipc provides four steps to size the roof drains on a building.
Secondary drainage shall be provided through the use of sidewall scuppers or internal roof drains.
Design assistance services are offered as a courtesy to the roofing design professional and contractors to ensure the project s success.