Install roof drip edge along the eaves add underlayment then place drip.
Roof drip edge installation after shingles.
It can be done.
Make sure the outer edge extends over the gutter.
How to install drip edge flashing on a roof step 1.
Measure the length of the eave you need to cover with drip edge using a tape measure.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
Place the metal roof drip edge flashing along the gable ends.
Save yourself some.
Windy september 22 2017 4 11pm 10.
4 deep nail the drip edge to the sheathing every 16 if installing multiple runs of drip edge lap them by 1 4 1 2 inch keeping the nail back from the lapped joint.
Drip edging is a strip of flashing that is applied to the edge of roofing prior to the installation of other items.
Place a nail at one end then the other.
How to install a drip edge.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
The way your sheeting is on top of the sub facia requires a drip edge to cover it so that the edge of the sheeting doesn t wick moisture into it.
If it doesn t pull the drip edge out slightly from under the shingles.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Be sure to tuck the drip edge under the starter strip and felt paper.
Once all the underlayment is applied go back and place.
It is designed to protect the roof s sheathing from water damage caused by rain snow or ice being blown or rolling back beneath the edge of the shingles.
Install the starter course.
The starter course is comprised.
Using a utility knife cut back the front end of the drip edge.
How to fix a roof drip edge installing roof drip edge flashing properly.
Secure the drip edge with roofing cement.
Now that the roof is applied it is much more difficult invasive time consuming to install the drip edge being 3 stories only makes it much worse.
Gently slide the flatter side of the drip edge under the eave.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Using drip edge with a nailing edge approx.
Slowly lift a shingle that is closest to the apex of the roof.
Push the drip edge a bit so that it passes under the shingle and appears from its other side.
This will allow for expansion and contraction and prevent buckling.
You may need to nail through the starter strip into the drip edge.
Slide the corner tight to the fascia.
Select enough lengths of.