In high wind areas sheathing along the eaves rakes and ridges is nailed every 6 in.
Roof framing checklist.
Building is safe and accessible.
The fields in the template include equipment standards of workers.
R802 3 the rafters are framed opposite each other at the ridges.
For most load bearing requirements a roof truss will need to be placed every two feet along the walls.
Get fix for any cut damaged joist or truss from joist or truss company.
Roof the ridges hips and valleys have shall be designed as beams for roof slopes 3 ft.
Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
Add studs under all double girder truss double joist.
Depending on how wide the home is you can divide the total length in feet by two to determine how many trusses will be needed.
R802 3 notches on the ends of rafters don t exceed the nominal joist depth.
Determine if continuous headers are toe nailed to studs with 4 8d nails.
Wall framing inspection checklist continued m.
Daily safety inspection report sample is an audit report which is obviously crucial for any company to track the health and well being of the employees.
Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points.
For all new construction.
Along the edges and every 12 in.
The american plywood association says there s no reduction in strength for nails overdriven by 1 16in.
Job address is posted in a visible location per irc section r319 1.
1 roof constructed in accordance with approved layout.
Toe nail rim board to sill plate at 6 on center.
Roof must be complete before framing inspection.
Truss roof framing as per design.
Determine if studs are toe nailed to sole plates with at least 3 8d or 2 16d nails.
Approved documents which show.
Determine how many rafters you ll need for the roof.
Locate the grade mark on the rafter to determine species and grade.
Roof framing inspection checklist 1.