Installed on the rafters with use of the flashing kit.
Roof light installation details.
See section 8 pages 25 26 27 suggested installation details.
Conservation technology epdm will outperform and outlast most other quality.
We call this an on the rafter installation or a proud installation.
The metal shall be fastened 6 on center with 12 ga.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Corrosion resistant roof nails or fasteners of compatible metals.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
Sawmills road diss norfolk ip22 4rg.
Registered in england wales reg no.
Fit the flashing against the skylight lift the shingles and nail the flashing at its top corners.
Install the roofing screws vertically along each rib in the panel.
Lift the first course of shingles above the skylight slit the underlayment the sheeting under the shingles and slip the saddle flashing s top edge up through the slit.
All joints shall be lapped a minimum of 2.
At the gable edge use a gable or sidewall flashing.
Standard glass roof light cad drawing references for flat roofs flush box sliding smoke vent and access roof lights.
This will keep weather out prevent lifting in high winds and provide a neat fin ished appearance.
2987024 vat no.
The rooflight height may be a little greater than the roof build up so the rooflight may sit slightly proud of the roof level however this still results in a beautiful external aesthetic for most roof types especially traditional builds.
Always view this manual in conjunction with the cross sectional installation details relevant to your project.
Installation is clean simple quick and safe.
To provide a drip edge allow an overhang of 1 to 2 inches at the eave.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
Size of each roof eliminating the risks associated with field seaming.
No heating torches or hazardous adhesives are required.