This guide must by read and understood in its entirety before beginning installation.
Roof panel installation.
Use your neoprene washer head screws to secure the metal to the sheathing.
Adjust door construction to desired size.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
Place the leading edge of the first panel along this line.
Installing corrugated roofing 1.
Use extreme care while installing roof panels.
Pre drill holes on the ridges.
Install the roofing screws vertically along each rib in the panel.
Cut to fit pitch of roof and around vent.
Make sure that the screws are all aligned evenly as you will be able to see them from the ground if they are.
Most panels come up to 32 feet 9 8 m in length.
Apply front and back panels similarly to side walls.
Measure the roof area.
At this point chalk a line from ridge to eave.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
You ll want to order metal panels that are an appropriate color and look to complement your.
Some panels have pre drilled holes.
Overlap roof panels one corrugation away from prevailing wind and nail to rafters starting from one end.
A 9 45 kw solar system installed on a 1 800 square foot roof costs between 39 600 and 81 000.
Install vent as close to roof peak as possible.
For exposed fasteners avoid over tightening the fastener.
Cut the panels to the desired length.
For use by its customers.
This is intended to be a guide only and does not.
If yours do not then you will need to drill holes.
Pbr panel safety study applicable osha and other safety requirements before following these instructions.
Space the screws about 12 in 30 cm apart.
5v crimp installation guidelines caution.
You will need to order enough metal material to cover the entire roof and this process.
This video provides a basic overview of installation for palram s consumer oriented corrugated roofing products including suntuf suntop palruf sun n.
5v crimp roofing must be applied on a minimum roof pitch of 2 12 or greater.
Panel installation should begin at the gable end of the roof opposite the prevailing rain bearing wind this will provide added assurance against wind driven rain being forced under the laps.
Measure one panel width in from the roof edge.
Place the first screw.
Remove the old roof.
Allow for a minimum of 18.