The base plate level and the center line of the truss column shall be marked based on reference datum and coordinate points given by main contractor surveyor.
Roof sheet installation method statement.
Roof installation method statement a basic guide to preparation introduction this guidance note gives practical information about creating a method statement.
The information and in particular the recommendations relating to the application and end use of sika products are given in good faith.
Implements and maintains safe working environment by adhering to correct work practices and procedures.
If you wish to use the template in appendix 2 to construct your own documents.
A completed sample template has been included in appendix 1 and a blank template in appendix 2.
The procedure shall be read in conjunction with contract specification wherever applicable.
1965 and be complete with plastic washers.
Before laying the screed cement slurry shall be brushed across the surface.
Application of polymer modified bitumen liquid membrane with cement screed for non insulated roof slab.
The screed shall be finished smooth to receive further finish as specified.
Roofing screws for corrugated sheets shall be galvanised and are to conform to bs 1494.
This swms covers high risk construction work hrcw controls related to.
This fabrication method statement covers the detailed procedure for fabrication and installation of any kind of steel structure decking slabs.
Ensure all items to be installed on the roof which require penetrations through the roof membrane are placed prior to the application of the membrane.
Make the appropriate method statement to submit to project manager.
Coordinate all installation delivery and safety activities at site.
7mm aluminium alloy 3105 h46 temper pvf2 colour finish.
All locations to be marked as per approved drawing.
The method statement was prepared by.
This roofing sheeting safe work method statement swms covers hazards and controls associated with the installation of a corrugated iron roof use and subsequent dismantling of roof edge protection systems.
Note this method statement has been developed using the site specific risk assessment the designer s residual risk register the trussed rafter association s product data sheets and health and safety in roof work hsg33.
Safety method statement prepared by humphrey and gray ltd.